Contact

EN

NEWS

2026/10/07

Jun Sung Park

11 Best Apartment Interior Design Companies in Ho Chi Minh City in 2026

Apartment interior design companies in Ho Chi Minh City work inside constraints a villa firm never meets.
Fixed walls, building rules, tight service lifts, and neighbors above and below.
RED Interior Design and Architecture ranks the 11 firms that handle those conditions well in 2026.

Key Takeaways

  • Apartment work is a different discipline from house work. The walls, the plumbing risers and the facade are fixed, so the entire design has to happen inside a box someone else built.
  • Your handover condition decides your scope before you hire anyone. A bare shell unit and a basic finished unit need completely different contracts, and most quote comparisons fail because the two are being compared against each other.
  • Built-in joinery is usually the largest cost line in an apartment, not loose furniture and not finishes. It is also the line where cheap packages hide their savings.
  • Building management rules control your timeline more than your designer does. Renovation deposits, permitted working hours and service lift bookings routinely add two to four weeks.
  • Twelve firms made this list, ranging from branded-residence specialists to high-volume design-and-build operators and expat-focused studios.

What Apartment Interior Design Companies Do Differently

When people search for apartment interior design companies, they usually assume any residential design firm will do. That assumption costs money. Apartment work is a constrained discipline, and the constraints are structural, legal and logistical rather than aesthetic. A firm that is excellent at villas can be genuinely poor at apartments, because almost everything it relies on in a villa is unavailable in a tower.

Consider what a villa designer takes for granted. They can move a wall. They can add a window. They can run new plumbing wherever the layout needs it. They can park a truck at the door and carry a three-meter stone slab straight in. In a 20th-floor apartment in Thu Duc, none of those things is true, and a designer who has not internalized that will produce drawings that cannot be built.

An Apartment Is a Box You Cannot Change

Here is what is actually fixed in a typical Ho Chi Minh City apartment, and what it means for your design.

  • Shear walls and columns. These carry the building. They cannot be cut, drilled deeply, or removed, and in most towers they sit exactly where you wish they did not. Your layout works around them or it does not get built.
  • Plumbing risers and drainage falls. Moving a bathroom or kitchen more than a short distance from the existing riser means raising the floor to maintain drainage fall, which eats ceiling height and often fails building approval outright.
  • The facade and balcony. Windows, external glazing and balcony railings belong to the building’s appearance, not to you. Enclosing a balcony is prohibited in most managed developments.
  • Slab penetrations. Core drilling through a floor slab for new services is usually banned, because the slab is post-tensioned and a drill can sever a tendon.
  • Ceiling height. Apartments are built tight. Every dropped ceiling for air conditioning or lighting takes from a budget you cannot replenish.

A firm that specializes in apartments knows all of this before it draws anything, so its first concept is already buildable. A firm that does not will present something beautiful, discover the riser problem in week three, and redesign on your time.

Why Generalist Firms Struggle in Towers

Beyond the physical limits, apartment projects carry an administrative layer that houses do not. Every managed development in Ho Chi Minh City has a building management board with its own renovation regime: an application form, a refundable deposit, an approved contractor list in some buildings, permitted working hours, noise windows, service lift bookings, and debris removal procedures.

Firms that work in towers weekly already hold relationships with these management offices. They know that one development allows drilling only between 9am and 11am, that another requires the lift to be booked three days ahead, and that a third insists on seeing stamped drawings before releasing the deposit. A firm learning those rules on your project is a firm spending your schedule on its own education.

The 2025 Ward Restructuring and Your Paperwork

One more administrative note that catches people out. On 1 July 2025, Ho Chi Minh City merged with Binh Duong and Ba Ria-Vung Tau, and the district system was replaced by 168 ward and commune level units. District 1 became several wards including Sai Gon Ward, District 5 became Cho Lon Ward, and Phu Nhuan District split into Phu Nhuan, Cau Kieu and Duc Nhuan wards.

For an apartment project this mostly affects paperwork rather than design. Renovation notifications, utility changes and any permit filings now reference ward-level authorities. It is also a quick credibility check on a firm’s website: a company still publishing pre-merger district addresses in late 2026 has not updated its materials in years, which tells you something about how current the rest of its information is.

Before You Shortlist: Identify Your Handover Condition

This is the step almost everyone skips, and it is the reason most people cannot compare quotes sensibly. Two firms can quote wildly different numbers for the “same” apartment simply because they assumed different starting conditions. Work out which of the three you have before you contact anyone.

Bare Shell Handover

You receive concrete floors, unplastered or plastered walls, capped services and nothing else. No flooring, no bathroom fittings, no doors, no kitchen. This is common in some investor-oriented developments and in older stock.

Your scope here is the full fit-out: plastering, flooring, electrical and plumbing distribution, air conditioning, ceilings, doors, bathrooms, kitchen, joinery and furniture. It is the most expensive starting point and also the most flexible, because nothing has to be demolished first.

Basic Finished Handover

The most common condition in Ho Chi Minh City’s mid and upper developments. You receive tiled or wood-finish floors, painted walls, bathroom sanitaryware, a basic kitchen cabinet run, interior doors and air conditioning provisions.

Your scope is usually joinery, lighting, feature finishes, window treatments and furniture, plus targeted demolition of anything the developer installed that you do not want. The trap here is demolition cost. Removing a developer kitchen and retiling the wall behind it is real work, and a quote that does not mention it has not accounted for it.

Fully Furnished Developer Package

Branded residences and some premium towers hand over complete, including furniture. Your scope becomes selective upgrading rather than fit-out: replacing specific pieces, adding storage, improving lighting, personalizing finishes.

This is the condition where you most need a firm willing to tell you to leave things alone. Ripping out a competent developer package to replace it with something marginally different is the most common way owners waste money in this segment.

If you are still working out what your space can become, our guide to apartment interior design covers the fundamentals of planning a unit from scratch.

How We Ranked These Firms

A ranking without stated criteria is just an opinion with numbers on it. Here is what we weighed, in order.

  1. Apartment volume specifically. Completed apartment projects, not residential work in general. A villa portfolio does not transfer.
  2. Experience in managed towers. Whether the firm regularly works inside developments with active management boards and renovation regimes.
  3. Joinery capability. Whether the firm has its own workshop or a long-term joinery partner, since built-ins carry most of an apartment’s quality and most of its cost.
  4. Execution control. Whether the firm supervises its own site teams or subcontracts and hopes.
  5. Cost transparency. Whether quotes are itemized to a bill of quantities or presented as a single package figure with no breakdown.
  6. Fit to a defined client segment. A firm that knows exactly who it serves outperforms a firm that claims to serve everyone.

On transparency: this guide is published by RED and RED appears first. We explain our reasoning below in terms you can check against our portfolio. Every other firm is assessed on its own merits, and several of them are a better fit than we are for specific budgets and apartment sizes.

Top 11 Apartment Interior Design Companies in Ho Chi Minh City for 2026

1. RED Interior Design and Architecture

Best for: High-end apartments, penthouses and owners who want design and construction management held by one accountable firm.

RED was founded in 2007 with 100% Korean investment and has worked continuously in Vietnam since. The firm operates from Phu My Hung and delivers across residential and commercial sectors for both Vietnamese and international clients.

What Sets RED Apart on Apartment Projects

Our core strength is holding both an in-house design team and an in-house construction management team. On an apartment that matters more than it does almost anywhere else, because apartment work is a sequence of small coordination problems compressed into a short program. A joinery dimension that is 15mm out, a ceiling that clashes with an air conditioning duct, a tile delivery that misses its lift booking: each one is minor in isolation, and together they are how an eight-week fit-out becomes a sixteen-week one.

When the designer and the site manager work for the same company, those get solved the same day. We are equally strong across offices, apartments and private homes, so the apartment work benefits from detailing standards developed on corporate projects where tolerance is unforgiving.

Relevant Experience

  • Residential: Apartments and villas across Vinhomes and Phu My Hung, plus private homes including Mr. D Villa, Ms. Tram Villa and Mrs. Kim’s House
  • Corporate detailing standards: Amorepacific Office Vietnam, Shinhan Bank, Samsung Engineering, SK E&S, Shin & Kim Law Firm
  • Retail and hospitality: Ferrari Showroom, J.Estina jewelry, Golden Sand Resort, The Chapel at Saigon, Brekkie Local Roastery and Bakery

You can view even more of our projects on our Portoflio

Contact Information

  • Address: Canh Vien 1, Tieu Nam Street, Phu My Hung Urban Area, Tan My Ward, Ho Chi Minh City
  • Phone: 028 5417 1429

2. Bel Decor

Best for: Luxury apartments in premium developments where the finished result has to match the renderings closely.

Bel Decor covers architecture, interior design and construction, with a residential portfolio that includes luxury apartments alongside offices, showrooms and hospitality work. The firm has delivered in premium developments such as Empire City and Diamond Island, and its completed spaces have tracked closely to the original visuals.

Address: Thanh Nien Investment Building, 345/134 Tran Hung Dao, Cau Ong Lanh, Ho Chi Minh City

3. Nha Xinh Group

Best for: Owners who want a coherent, showroom-verified look without a long bespoke design process.

Nha Xinh is one of Vietnam’s longest-established residential interior brands, covering luxury residential interiors including apartments and villas, commercial work, and premium furniture supply through an extensive showroom network. The showrooms are the real advantage: you can sit on the sofa and open the wardrobe before you commit.

Address: 107-109 Vo Nguyen Giap, An Khanh, Thu Duc City, Ho Chi Minh City 

4. Hometalk

Best for: Owners who want one company to design, manufacture and install, with minimal involvement from themselves.

Hometalk offers full-service design and build through a closed-loop process, backed by its own production workshop. Residential properties and kitchens are core territory. For an owner living overseas or simply short on time, a single point of contact across design, manufacturing and installation removes most of the coordination burden.

Address: 668/21 National Highway 13, Phuoc Ward, Thu Duc City, Ho Chi Minh City

5. LifeConcept

Best for: Owner-occupiers who want the design shaped around how they actually use the space.

LifeConcept works across condominiums, townhouses, villas and offices with a user-centered design philosophy, developing each project around the client’s lifestyle rather than a house style. With more than a decade in design and furniture production, the firm handles the full range of construction requirements.

Address: Unit 6.03, Hometalk Building, 236 Dinh Bo Linh, Ward 26, Binh Thanh District, Ho Chi Minh City

6. XHOME Saigon

Best for: Standard apartments and townhouses where budget control matters as much as design.

XHOME has built strong recognition in the apartment and townhouse segment in Ho Chi Minh City, offering end-to-end solutions through a clearly structured process, backed by factory capability. Its core strength is balancing cost against quality, supported by a design team that stays current with trends.

Address: Orient Building, 331 Ben Van Don, Vinh Hoi, Ho Chi Minh City

7. WEO Design

Best for: Residential interiors in apartments and townhouses for owners who want a clean contemporary result.

WEO Design works in residential interiors with apartments and townhouses as its primary categories. The firm sits in the practical middle of the market, which suits standard two and three bedroom units where the brief is a well-resolved home rather than a statement.

Address: 67 D5 Street, An Khanh Ward, Ho Chi Minh City

8. Lio Decor

Best for: Timber-led apartment interiors where built-in joinery carries the design.

Lio Decor designs and manufactures wooden interiors for apartments, villas and townhouses, with a style that leans minimal, warm and practical. In-house production allows flexible customization while keeping costs efficient, which matters in apartments because joinery is the dominant cost line.

Address: 124 Street No. 28, An Phu Hung Residential Area, Tan Hung, Ho Chi Minh City

9. MoreHome

Best for: Owners who want one firm across several properties at different price points.

MoreHome operates in both Hanoi and Ho Chi Minh City across high-end residential, office and hotel interior design, handling everything from mid-range apartments to luxury villas with customizable interior solutions. For an owner with a portfolio spanning cities and budgets, that range removes the need to manage several relationships.

Address: 260/12 To Ngoc Van Street, Quarter 7, Hiep Binh, Ho Chi Minh City

10. Nam Phu Decor

Best for: Premium apartments and high-end townhouses at sensible price points.

Nam Phu Decor works across high-end villas, luxury townhouses, premium apartments and modern offices, offering interior design across project types at reasonable price points. It suits owners who want a functional, attractive apartment without a one-of-a-kind bespoke process.

Address: 98 Street No. 10, Van Phuc Urban Area, Hiep Binh, Ho Chi Minh City

11. Kimbanjang Interior

Best for: Expat owners and tenants who want full-service delivery with communication in their own language.

Kimbanjang is a full-service luxury interior design and construction company covering residential, commercial, F&B, entertainment and hospitality spaces, with a specialization in Korean-style interiors for expats and foreigners in Ho Chi Minh City. The firm operates from Binh Khanh Ward in Thu Duc, close to much of the city’s expat apartment stock.

Address: 150 Tran Nao, Binh Khanh, An Khanh, Ho Chi Minh City

Quick Comparison: Which Firm Fits Which Apartment

Firm Apartment sweet spot In-house build or joinery Best suited to
RED Interior Design and Architecture High-end apartments and penthouses In-house design and construction management Owners prioritizing execution and detailing
Bel Decor Luxury apartments in premium towers Yes Empire City, Diamond Island tier units
Nha Xinh Group Mid to high-end apartments Furniture manufacturing Owners who want showroom-verified pieces
Hometalk Full-service apartment fit-out Own workshop Hands-off and overseas owners
LifeConcept Condominiums and townhouses Yes Owner-occupiers wanting a tailored layout
XHOME Saigon Standard apartments and townhouses Factory capability Budget-conscious, process-driven projects
WEO Design Apartments and townhouses Design-led Standard 2 and 3 bedroom homes
Lio Decor Timber-led apartment interiors Own production Joinery-heavy, warm minimal schemes
MoreHome Mid-range to luxury apartments Yes Multi-property and multi-city owners
Nam Phu Decor Premium apartments Yes Value-focused high-end work
Kimbanjang Interior Expat apartment fit-out Yes Korean and foreign residents

What Apartment Interior Design Costs in Ho Chi Minh City

Apartment pricing in this market is unusually opaque, because two very different quoting models sit side by side and most owners do not realize they are comparing across them.

The Two Quoting Models You Will Encounter

  • The packaged rate per square meter. A single figure covering design and construction, multiplied by floor area. Common among high-volume apartment firms and genuinely useful for fast comparison. The weakness is that the specification sits inside the number, so two identical rates can deliver very different cabinet hardware, board thickness and paint systems.
  • Separate design fee plus itemized construction. A design fee quoted on its own, then a bill of quantities listing every element with a unit price. Harder to skim, far easier to audit, and the only model that lets you see what a variation actually costs.

Our view is that packaged rates are fine on standard units where you have seen physical samples of what the rate includes, and risky on anything bespoke. If a firm quotes a package, ask for the specification sheet behind it. A firm that cannot produce one is quoting a number rather than a scope.

The Three Budget Lines in an Apartment

Apartment budgets break down differently from house budgets, and the surprise for most owners is which line dominates.

  1. Built-in joinery. Usually the largest line. Wardrobes, the kitchen, the television wall, entry storage, bed frames with integrated storage, bathroom vanities. Apartments rely on built-ins precisely because floor area is scarce, and this is where quality differences are invisible at handover and obvious after two years.
  2. Construction and finishes. Demolition of unwanted developer items, flooring, ceilings, electrical and lighting changes, painting, tiling, air conditioning adjustments. Predictable when the drawings are complete.
  3. Loose furniture and soft goods. Sofas, dining sets, beds, rugs, curtains, lighting fixtures. The most visible line and often the smallest, unless imported pieces are specified.

The design fee sits outside these three and is typically the smallest cost in the project. It is also the one owners negotiate hardest, which is usually a mistake: weak documentation is paid for later in site variations.

For current market figures across project categories, our interior design cost guide sets out what work is running at in Vietnam.

What Packaged Apartment Quotes Routinely Leave Out

Check each of these explicitly before you sign. They are the items that turn an agreed figure into a larger final invoice.

  • Demolition and disposal of developer-installed items you are removing, including debris haulage, which buildings often charge for by the load.
  • The renovation deposit held by the building management board, refundable on clean completion but payable up front.
  • Air conditioning modifications. Relocating an indoor unit affects refrigerant piping and condensate drainage, and condensate needs a fall you may not have.
  • Electrical capacity. Induction cooking, a wine cabinet, a bidet seat and a home office can exceed the circuit provision the developer installed.
  • Curtains, blinds and tracks. Frequently excluded from fit-out packages and surprisingly expensive across a full apartment.
  • Protection and cleaning. Lift protection, corridor protection and final cleaning are real line items in managed buildings.

The Building Rules That Decide Your Timeline

Owners assume the designer controls the schedule. In an apartment, the building management board controls more of it than anyone. Understanding the regime before you start lets you plan a realistic move-in date instead of a hopeful one.

Renovation Application and Deposit

Most managed developments require a renovation application before any work begins, typically including drawings, a contractor list, worker identification and an insurance declaration. A refundable deposit is held against damage to common areas. Approval takes days to weeks depending on the building, and work genuinely cannot start before it lands.

Because of that, your contractor should submit the application while design development is still finishing, not after. A firm that waits until drawings are fully complete before applying has added its own idle time to your program.

Working Hours, Noise Windows and the Service Lift

Once approved, the daily constraints begin. Buildings restrict working hours, usually excluding early mornings, evenings, Sundays and public holidays. Noisy work such as drilling, demolition and tile cutting is often confined to a narrower window within that, sometimes only a few hours per day.

Material movement runs through a booked service lift shared with every other resident and contractor in the tower. A single lift booking missed can delay a tiling crew by a day, and that day cascades into every trade behind it. Experienced apartment firms build this into their programs. Inexperienced ones discover it in week two.

What You Are Usually Not Allowed to Change

  • Shear walls, columns and any structural element
  • The facade, external windows and balcony enclosure
  • Fire detection and sprinkler layouts, which must remain compliant and accessible
  • Main drainage risers and gas pipework routes
  • Core drilling through floor slabs in post-tensioned buildings

A good firm tells you these limits in the first meeting. A firm that promises to open up a structural wall is either going to fail the approval or is willing to do something unsafe, and neither is a partner you want.

How to Vet an Apartment Interior Design Company: Six Steps

Follow these in order. Each one narrows the field, so by the time you are comparing prices you are comparing firms that can all genuinely deliver.

Step 1: Filter by Apartment Experience, Not Residential Experience

Start here because it removes the most candidates fastest. Ask how many apartment projects the firm completed in the last twelve months and in which developments. A firm that names five towers you recognize has the management-board relationships that will protect your schedule. A firm that answers with villa photographs has told you what it actually does.

Step 2: Match the Portfolio to Your Unit Size

Having established apartment experience, narrow by scale, because design problems change completely with floor area. A compact two bedroom needs storage ingenuity and circulation discipline; a large three bedroom needs zoning and acoustic separation; a penthouse needs something closer to house design.

Our guides to 2 bedroom apartment interior design and 3 bedroom apartment interior design show what resolved work at each size looks like, and the walkthrough of 70m2 apartment interior design is a useful benchmark for the most common unit size in the city.

Step 3: Inspect the Joinery, Not the Renderings

Since built-ins carry most of your budget and most of your long-term satisfaction, this is the step that separates firms that look similar on paper. Ask to visit a completed apartment or the workshop, then check the things that fail first.

  • Door and drawer alignment. Gaps should be even across a run. Uneven gaps mean the carcasses were not set true.
  • Edge banding. Run a finger along the edge of a door. It should feel continuous, not ridged or lifting.
  • Hardware. Open a drawer fully and close it. Quality runners are smooth and self-closing; cheap ones rattle and sag within a year.
  • Interior finishing. Open a wardrobe and look at the inside back panel. Firms that cut corners cut them where you do not usually look.
  • Moisture detailing. Under a sink and in bathroom vanities, check for sealed edges and water-resistant board. This is the single most common point of failure in Ho Chi Minh City’s humidity.

Step 4: Confirm Who Handles the Building Management Board

With quality established, turn to logistics. Ask directly: who submits the renovation application, who books the service lift, who pays the deposit, and who is on site when the building inspects. The right answer is the contractor, in writing, as part of the scope.

If the firm expects you to manage the building relationship yourself, that is a legitimate model, but it is work you will be doing on weekday mornings for two months. Price it accordingly.

Step 5: Read the Specification Behind the Price

Now that scope is clear, the number becomes readable. For a packaged rate, request the specification sheet: board type and thickness, hinge and runner brand, paint system, tile allowance, sanitaryware allowance, lighting allowance. For an itemized quote, check that every allowance has a figure attached.

The word to watch is “allowance.” An allowance is a placeholder, and anything above it is billed to you later. Count how many your quote contains before you treat the total as a total.

Step 6: Agree the Program and the Variation Process in Writing

Finally, lock the two things that cause the most disputes. Get a week-by-week program showing the renovation application, each trade, the joinery installation date and handover. Then get the variation procedure: how a change is priced, who approves it, and whether it affects the program.

Apartment fit-outs are short projects, which means a two-week delay is proportionally severe. A firm that writes a program and a variation process without being pushed is a firm that has run enough of these to know where they go wrong. For a broader view of how the phases connect, our breakdown of the interior design process covers each stage from brief to handover.

Ten Questions to Ask in the First Meeting

  • How many apartments did you complete last year, and in which buildings?
  • Have you worked in my development before, and do you know its renovation rules?
  • Is the joinery made in your own workshop or outsourced?
  • Who is on site daily, and do they work for you or for a subcontractor?
  • Can I see a completed apartment in person, ideally one finished over a year ago?
  • What exactly is excluded from this quote?
  • How many allowances does this quote contain, and what are they?
  • Who submits the renovation application and pays the building deposit?
  • What is your warranty on joinery, and what does it cover?
  • What happens to the program if the building rejects the application?

The fifth question carries the most weight. A freshly handed-over apartment looks perfect. One at the eighteen-month mark shows whether the doors still align, whether the vanity has swollen, and whether anyone answered the phone when something needed fixing.

Matching the Firm to Your Apartment Type

Different units reward different capabilities. Use this once you know what you are working with.

Studio and One Bedroom Units

Prioritize firms with strong joinery and spatial planning, because in a small unit every square meter is doing two jobs and storage is the whole game. A design-and-build operator with an efficient process usually serves these better than a bespoke studio, since the fee structure of a bespoke process is hard to justify at this scale.

Two and Three Bedroom Family Apartments

Prioritize firms that plan around daily routines rather than visual themes, because this is where circulation, storage and acoustic separation determine whether the home works. Layout decisions matter most here, and our guides to living room layout and master bedroom layout cover the planning principles. For the shared living space specifically, see apartment living room design.

High-End and Branded Residence Units

Prioritize execution control and detailing standards, because at this level the difference between firms shows in reveal lines, shadow gaps and material transitions rather than in concept. Our guide to luxury apartment interior design sets the reference point, and for top-floor units the constraints shift again, as covered in penthouse interior design.

Rental and Investment Units

Prioritize durability and speed over originality, because your return depends on occupancy, not on a distinctive concept. Specify hard-wearing finishes, neutral palettes and joinery that survives tenant turnover. A fast, process-driven firm with a packaged rate is usually the correct choice here, and a bespoke studio is usually the wrong one.

Units Where Feng Shui Matters

Many Vietnamese owners plan the layout around feng shui principles, particularly in bedrooms and entry areas. Raise this at the brief stage rather than at drawing review, because bed position, door alignment and mirror placement affect the whole layout. Our guide to the feng shui bedroom covers the principles most commonly applied in apartments.

Choosing the Right Apartment Interior Design Partner in Ho Chi Minh City

None of the twelve firms above is right for every apartment, and that is the useful conclusion rather than a hedge. XHOME and Nam Phu are built for budget discipline. Lio Decor owns timber-led schemes. Hometalk suits owners who want to disappear until handover. Bel Decor and RED belong on high-end units where execution tolerance is tight. Kimbanjang exists for a specific community and serves it well.

Our own position, after nearly two decades of building in this city, is that apartment projects are won or lost on coordination rather than on concept. The layout can be revised in a week. A joinery run installed 20mm out of true, in a unit where nothing can be moved to hide it, is permanent. That is why we hold design and construction management in the same office, and why we judge other firms by the same standard.

Before you shortlist anyone, settle three things: your handover condition, your building’s renovation rules, and whether you want a packaged rate or an itemized quote. Those three answers will eliminate most of the market for you and make the remaining conversations far shorter.

If your apartment needs a partner who can take it from first layout through final handover, explore the full range of services on the RED Interior Design and Architecture site, or contact our team to talk through your unit. We will tell you plainly if another firm on this list fits your budget better.

Frequently Asked Questions

1. What should I look for in apartment interior design companies specifically?

Apartment volume in the last twelve months, named experience in managed towers, in-house or long-term joinery capability, and a willingness to state what is excluded from the quote. General residential experience does not transfer, because apartment work is governed by structural limits and building management rules that houses do not have.

2. How long does an apartment fit-out take in Ho Chi Minh City?

Design usually runs three to six weeks for a standard unit. Construction and installation typically run six to twelve weeks depending on scope and handover condition. Add one to three weeks for the building’s renovation approval before work can start, and more if joinery or imported furniture has a long lead time. Restricted working hours in managed buildings extend every stage.

3. Is a packaged price per square meter a good way to compare apartment quotes?

Only if you also compare the specifications behind the rates. Two identical rates can cover different board thickness, hardware brands, paint systems and tile allowances, which is where the difference in final quality lives. Ask every firm for the specification sheet and the list of allowances, then compare those alongside the number.

4. Can I move a bathroom or kitchen in my apartment?

Rarely by much. Drainage needs a continuous fall to the existing riser, so moving a wet area any significant distance means raising the floor, which costs ceiling height and often fails building approval. Small relocations within a meter or two are sometimes possible. Ask your designer to check the riser position before any layout work begins.

5. Do I need approval from my building before starting interior work?

In almost every managed development in Ho Chi Minh City, yes. Expect a renovation application with drawings and contractor details, a refundable deposit against common-area damage, restricted working hours, and service lift bookings for material movement. Your contractor should handle the submission as part of the scope, and should file it before the drawings are fully finished to save time.

6. Should I use the same firm for design and construction on an apartment?

Usually yes. Apartment programs are short and dense, so the coordination gap between a separate designer and contractor causes proportionally more damage than it would on a larger project. Splitting the two makes most sense when you have an unusually complex design and a project manager of your own to hold both sides accountable.