Office interior design cost in Vietnam runs from a few hundred thousand dong per square meter to well over ten million.
That spread is real, and it is not vague quoting.
RED Interior Design and Architecture breaks down every line below so you can budget your project accurately.
Before any numbers are useful, the terms have to be clear, because the phrase office interior design cost gets used for three different things in this market and quotes are routinely compared across them.
This is what you pay a firm to produce the thinking and the documentation: space planning, concept development, 3D visualization, technical drawings, reflected ceiling plans, electrical and data layouts, furniture specifications, material schedules and a bill of quantities. It buys no physical material at all.
In Vietnam the design fee is almost always quoted per square meter of floor area, and it usually falls between 150,000 and 1,200,000 VND per square meter depending on the firm’s tier and the complexity of the brief.

This is the construction itself: demolition, partitions, ceilings, flooring, painting, electrical and data distribution, air conditioning modifications, lighting, joinery, doors and glazing. It is the largest number in your budget and it is quoted either per square meter as a packaged rate or as an itemized bill of quantities.
Design fee plus fit-out plus loose furniture plus technology plus the costs nobody mentions in the first meeting. This is the number your finance director needs, and it is the one most quotes do not give you.
A quick test for any proposal you receive: if you cannot point at which of these three the number refers to, you are not yet in a position to compare it with anything.
Here is what the market is actually charging. Treat these as planning ranges rather than quotations, since material prices and labor rates move through the year.
Design fees in Vietnam typically slide downward as floor area increases, because the fixed thinking cost spreads across more square meters.
| Firm tier | Design fee (VND per m2) | What you receive |
| Volume and budget providers | 150,000 to 300,000 | Space plan, basic 3D views, construction drawings. Often bundled free with a build contract. |
| Professional standard | 300,000 to 500,000 | Full concept development, complete technical documentation, furniture and material specifications, site supervision visits. |
| Premium and corporate | 600,000 to 1,200,000 | Workplace strategy, brand integration, detailed joinery design, acoustic and lighting design, full bill of quantities, close supervision. |
Firms also commonly scale the rate by area: roughly 300,000 VND per square meter under 100 square meters, 250,000 between 100 and 300, and 200,000 between 300 and 600, with larger projects quoted individually.
This is where the real money sits. The domestic Vietnamese market broadly quotes in three bands.
| Tier | VND per m2 | Approximate USD per m2 | Typical specification |
| Basic | 4,000,000 to 6,000,000 | 155 to 230 | Workstations, task chairs, filing cabinets, partition systems, gypsum ceilings, electrical and plumbing installed. MDF and MFC engineered boards. |
| Mid-range | 6,000,000 to 8,000,000 | 230 to 310 | Better board and hardware, laminate or veneer joinery, improved lighting, some glass partitioning, meeting room fit-out. |
| High-end | 10,000,000 and above | 385 and above | Veneer, stone and soundproof glass, acoustic treatment, integrated AV, premium seating, bespoke reception and executive areas. |
USD figures use roughly 26,000 VND to the dollar and will drift with the exchange rate.
Separately from the domestic market, Cushman & Wakefield publishes an annual fit-out cost guide benchmarking international-standard corporate offices across Asia Pacific. Its findings for Vietnam are worth knowing even if you are a local company, because they tell you what the top of the market pays.
That positioning is a genuine commercial advantage for companies setting up in Vietnam. It is also the reason international firms budget confidently here: the same workplace standard costs a fraction of what it would in Tokyo, Sydney or Singapore.
Notice that the Cushman & Wakefield figure of roughly USD 656 per square meter converts to around 17,000,000 VND per square meter, which sits well above even the high-end domestic band of 10,000,000. That is not a contradiction and neither number is wrong. They describe different products.

The gap comes from six things, and understanding them tells you which market your own project belongs in.
Our view at RED, having delivered offices for Shinhan Bank, Samsung Engineering, SK E&S and Amorepacific Vietnam alongside projects for domestic companies, is that most businesses sit between the two models rather than squarely in either. The useful exercise is deciding which of the six items above your organization genuinely needs, rather than accepting or rejecting an entire standard.
Abstract rates are hard to plan with, so here are three complete scenarios. Each shows the full project cost rather than a single rate, which is how your finance team will want to see it.
Brief: 20 staff, open plan, one meeting room, a small pantry, basic reception. Leased space with a basic finished handover.
At this scale, the design fee is a small fraction of the total, which is exactly why cutting it is poor economics. A weak space plan in a 150 square meter office wastes floor area you are paying rent on every month for the length of the lease.
Brief: 70 staff, mixed open plan and enclosed offices, three meeting rooms, a boardroom, a proper reception, a staff pantry and a breakout area.
This is the size where the enclosed-to-open ratio starts driving the budget hard. Every additional enclosed room adds partitions, a door, a dedicated air conditioning zone, separate lighting control and often acoustic treatment. Two extra meeting rooms can move a 600 square meter budget by several hundred million dong.
Brief: 180 staff, international workplace standard, video conferencing throughout, sit-stand desks, a server room, acoustic separation, brand integration, sustainability targets.
At this level the professional fees and contingency that local quotes omit become unavoidable, because the cost of an uncontrolled variation on a project this size dwarfs the fee that would have prevented it.
Understanding the components matters more than memorizing a rate, because it tells you which conversations will actually move your budget. A typical office fit-out splits across five groups.
Demolition, partitions, ceilings, flooring, painting, doors and glazing. This is the visible shell of the office and usually the largest single group in a domestic fit-out. The cost driver here is not finish quality so much as the number of enclosed rooms, because every wall is material, labor, a door, and knock-on work in the ceiling and floor.
Power distribution, lighting, air conditioning modifications, fire detection and sprinkler adjustments, data cabling containment. This is the group owners consistently underestimate because none of it is visible when finished.
Watch for two specific items. Relocating air conditioning indoor units requires refrigerant piping and condensate drainage with a continuous fall, which is often harder than it sounds. And any change to your room layout changes the sprinkler and smoke detector pattern, which must remain compliant and is inspected.

Workstations, task chairs, meeting tables, soft seating, storage. In a basic domestic fit-out this might be a modest share. In an international corporate fit-out it is frequently the largest component of all. The difference between a locally made task chair and a specified ergonomic chair from a global brand can be five to ten times per seat, multiplied by every employee.
This is the line where a clear decision early saves the most money. Decide your furniture standard before design development, not after, because the space plan depends on the footprint of what you choose.
Displays, video conferencing, room booking systems, structured cabling, access control, the server room. Costs scale with the number of meeting rooms rather than with floor area, so a small office with four meeting rooms can carry a higher AV cost per square meter than a large one with two.
Reception desk, pantry, feature walls, bespoke storage, the boardroom. These are concentrated spends in a small percentage of the floor area, and they carry most of the visitor impression. A sensible strategy for a constrained budget is to hold standard specification across the working floor and concentrate quality into reception and the boardroom, which are the two rooms clients actually see.
Two offices of identical size can differ by a factor of three. These are the variables responsible, roughly in order of impact.
These are the items that turn an agreed figure into a larger final invoice. Ask about each one explicitly before you sign.
Once you have three proposals on the desk, the comparison itself is a skill. Work through these in order.
Start here, because comparing totals built on different scopes produces a confidently wrong answer. List every element: demolition, partitions, ceilings, flooring, electrical, air conditioning, lighting, furniture, AV, joinery, signage. Mark which quotes include each. You will usually find the cheapest quote is cheapest because it excludes two or three items the others carry.
Now that scope is aligned, look for placeholder figures. An allowance is not a price; it is a number that will be replaced by the real cost later and billed to you. A quote with eight allowances is substantially less committed than a quote with one, even if the totals match.

With allowances identified, examine what the committed items actually buy. Board type and thickness, hinge and runner brands, paint system, ceiling tile specification, partition construction, glass thickness, carpet weight. Two quotes at the same rate per square meter can differ enormously here, and this is where the cheaper one usually got cheaper.
Having compared content, compare responsibility. Who obtains landlord approval? Who pays if the building rejects the drawings? Who covers after-hours access charges? Who is liable for damage to common areas? Each of these is a real cost that lands on someone.
Finally, read how changes are priced, because every office project has them. The clause should state how a variation is valued, who approves it, and whether it affects the program. A contract with a vague variation clause is a contract whose final price is unknown, whatever the headline figure says.
For a fuller view of how the stages connect before construction begins, our breakdown of the office interior design process walks through each phase from brief to handover.
Every project has a budget conversation. These are the trades that work and the ones that cost more later.
How you pay matters almost as much as what you pay. A sound schedule ties money to delivered milestones rather than to the calendar.
Be cautious of any schedule front-loading a large payment with no defined deliverable attached. Confirm in writing what happens if the landlord rejects the drawings or the program slips through no fault of yours.
Backed by over 30 years of industry experience and Korean design precision, RED Interior Design & Architecture delivers turnkey office environments tailored to your capital expenditure goals.
RED is a trusted design and build partner for leading international corporations across Vietnam, including Shinhan Bank, Samsung Engineering, SK E&S, Amorepacific, and Shin & Kim Law Firm.
Our team helps you optimize every dollar, delivering sophisticated, high-performance workspaces on time and within budget.
The honest summary of this market is that Vietnam offers unusually good value and unusually wide variance. A basic 150 square meter office can be delivered for under 800 million VND all in. A 1,500 square meter international regional headquarters can pass 30 billion. Both are reasonable prices for what they are, and the only way to know which end of that range your project sits at is to define the specification before you ask for a number.
Our view, after nearly two decades of delivering offices in this city, is that cost overruns almost never come from the rate per square meter. They come from scope that was never defined, allowances that were never priced, and drawings that were never finished before work started. Those three things are controllable, and they are controlled during design, which is the cheapest phase of the project.
Decide three things before you approach any firm: your enclosed-to-open ratio, your furniture standard, and whether you are buying a domestic fit-out or an international one. With those settled, every quote you receive becomes comparable, and the conversation moves from price to value.
If you want a costed proposal for your space, explore the full range of services on the RED Interior Design and Architecture site, or contact our team to discuss your requirements. We will give you an itemized breakdown rather than a single rate, and tell you honestly where your brief and your budget do not yet match.
Design fees typically run 150,000 to 1,200,000 VND per square meter depending on the firm’s tier, and fit-out construction typically runs 4,000,000 to over 10,000,000 VND per square meter. For international-standard corporate fit-outs, Cushman & Wakefield benchmarks Ho Chi Minh City at around USD 656 per square meter for a new fit-out and around USD 344 for an upgrade.
Sometimes, and that is the problem. Many design-and-build firms advertise free design when you award them the construction contract. The fee has not disappeared, it has moved inside the build price where you cannot audit it. Ask for the design fee to be shown as a separate line even when it is bundled, so you can see what you are paying for documentation.
Because the expensive invisible work is already there. Ceiling grids, air conditioning distribution, electrical risers, sprinkler layouts and sometimes flooring can be retained if they are sound. Cushman & Wakefield’s Ho Chi Minh City figures put an upgrade at roughly half the cost of a new fit-out, which is why a proper condition survey before you commit to a strategy pays for itself many times over.
Design usually runs four to eight weeks depending on size and how many concept rounds you need. Landlord and building approval adds one to three weeks. Construction typically runs six to sixteen weeks by scale and complexity. Long lead furniture and AV equipment can extend the handover date if ordered late, so place those orders during construction rather than after it.
On most projects it lands somewhere between three and eight percent of total project cost, trending toward the lower end as floor area grows. Treating it as a line to minimize is usually false economy, since the documentation it produces is what keeps the other ninety-plus percent under control.
For most offices under roughly 2,000 square meters, yes. Office fit-outs are short, dense programs where coordination failures do disproportionate damage, and a single accountable party removes the gap between designer and contractor. Separating the two makes more sense on large or multi-phase projects where you have your own project manager to hold both sides to account.