Office Interior Design Cost in Vietnam: The Complete 2026 Price Guide

Office interior design cost in Vietnam runs from a few hundred thousand dong per square meter to well over ten million.
That spread is real, and it is not vague quoting.
RED Interior Design and Architecture breaks down every line below so you can budget your project accurately.

Key Takeaways

  • The design fee and the fit-out cost are two separate numbers. Design typically runs 150,000 to 1,200,000 VND per square meter. Construction and furnishing typically runs 4,000,000 to over 10,000,000 VND per square meter. Confusing the two is the single most common budgeting error.
  • Two different markets quote side by side in Vietnam. A domestic fit-out and an international corporate fit-out can differ by a factor of two to three for the same floor area, and both quotes are honest.
  • Vietnam is one of the cheapest office fit-out markets in Asia Pacific. Cushman & Wakefield put Ho Chi Minh City at around USD 656 per square meter for a new international-standard fit-out, against Tokyo at roughly USD 2,096.
  • Furniture and mechanical and electrical work usually outweigh the visible finishes. Owners budget for the feature wall and underestimate the air conditioning modification behind it.
  • Refurbishing an existing office costs roughly half of a new fit-out, which makes a careful condition survey one of the highest-return hours in the whole project.

What Office Interior Design Cost Actually Covers

Before any numbers are useful, the terms have to be clear, because the phrase office interior design cost gets used for three different things in this market and quotes are routinely compared across them.

The Design Fee

This is what you pay a firm to produce the thinking and the documentation: space planning, concept development, 3D visualization, technical drawings, reflected ceiling plans, electrical and data layouts, furniture specifications, material schedules and a bill of quantities. It buys no physical material at all.

In Vietnam the design fee is almost always quoted per square meter of floor area, and it usually falls between 150,000 and 1,200,000 VND per square meter depending on the firm’s tier and the complexity of the brief.

The Fit-Out Cost

This is the construction itself: demolition, partitions, ceilings, flooring, painting, electrical and data distribution, air conditioning modifications, lighting, joinery, doors and glazing. It is the largest number in your budget and it is quoted either per square meter as a packaged rate or as an itemized bill of quantities.

The Total Project Cost

Design fee plus fit-out plus loose furniture plus technology plus the costs nobody mentions in the first meeting. This is the number your finance director needs, and it is the one most quotes do not give you.

A quick test for any proposal you receive: if you cannot point at which of these three the number refers to, you are not yet in a position to compare it with anything.

Office Interior Design Cost in Vietnam: The 2026 Numbers

Here is what the market is actually charging. Treat these as planning ranges rather than quotations, since material prices and labor rates move through the year.

Design Fees by Office Size and Firm Tier

Design fees in Vietnam typically slide downward as floor area increases, because the fixed thinking cost spreads across more square meters.

Firm tier Design fee (VND per m2) What you receive
Volume and budget providers 150,000 to 300,000 Space plan, basic 3D views, construction drawings. Often bundled free with a build contract.
Professional standard 300,000 to 500,000 Full concept development, complete technical documentation, furniture and material specifications, site supervision visits.
Premium and corporate 600,000 to 1,200,000 Workplace strategy, brand integration, detailed joinery design, acoustic and lighting design, full bill of quantities, close supervision.

Firms also commonly scale the rate by area: roughly 300,000 VND per square meter under 100 square meters, 250,000 between 100 and 300, and 200,000 between 300 and 600, with larger projects quoted individually.

Fit-Out Construction Cost by Tier

This is where the real money sits. The domestic Vietnamese market broadly quotes in three bands.

Tier VND per m2 Approximate USD per m2 Typical specification
Basic 4,000,000 to 6,000,000 155 to 230 Workstations, task chairs, filing cabinets, partition systems, gypsum ceilings, electrical and plumbing installed. MDF and MFC engineered boards.
Mid-range 6,000,000 to 8,000,000 230 to 310 Better board and hardware, laminate or veneer joinery, improved lighting, some glass partitioning, meeting room fit-out.
High-end 10,000,000 and above 385 and above Veneer, stone and soundproof glass, acoustic treatment, integrated AV, premium seating, bespoke reception and executive areas.

USD figures use roughly 26,000 VND to the dollar and will drift with the exchange rate.

The International Benchmark

Separately from the domestic market, Cushman & Wakefield publishes an annual fit-out cost guide benchmarking international-standard corporate offices across Asia Pacific. Its findings for Vietnam are worth knowing even if you are a local company, because they tell you what the top of the market pays.

  • Ho Chi Minh City: around USD 656 per square meter for a new fit-out, and around USD 344 per square meter for upgrading an existing office.
  • Hanoi: around USD 678 per square meter for a new fit-out, and around USD 355 per square meter for an upgrade.
  • Regional context: Tokyo tops the region at roughly USD 2,096 per square meter and Jakarta sits at the bottom at roughly USD 624. Both Vietnamese cities rank among the three least expensive markets in Asia Pacific.

That positioning is a genuine commercial advantage for companies setting up in Vietnam. It is also the reason international firms budget confidently here: the same workplace standard costs a fraction of what it would in Tokyo, Sydney or Singapore.

Why a Multinational Pays Two to Three Times a Local Quote

Notice that the Cushman & Wakefield figure of roughly USD 656 per square meter converts to around 17,000,000 VND per square meter, which sits well above even the high-end domestic band of 10,000,000. That is not a contradiction and neither number is wrong. They describe different products.

The gap comes from six things, and understanding them tells you which market your own project belongs in.

  1. Furniture grade. International specifications call for ergonomic task seating and sit-stand desks from global manufacturers, which can cost several times the local equivalent per workstation. In many corporate fit-outs furniture alone is the single largest component.
  2. Mechanical and electrical scope. Multinationals frequently upgrade base building provision: supplementary air conditioning for meeting rooms and server rooms, additional power circuits, emergency lighting upgrades and dedicated fire detection for enclosed spaces.
  3. Audio visual and IT. Video conferencing in every meeting room, room booking panels, structured cabling, access control and a properly built server room. A local fit-out often treats this as the tenant’s separate problem; a corporate fit-out includes it.
  4. Acoustic performance. Full-height partitions with insulation, acoustic ceiling tiles, sound masking and glazed partitions with acoustic ratings. This is invisible in photographs and expensive to build.
  5. Global standards compliance. Head office workplace guidelines, accessibility requirements, sustainability targets and green building certification all add scope, documentation and cost.
  6. Professional fees and contingency. International projects carry project management fees, quantity surveying and a contingency line of five to ten percent. Local quotes usually carry none of these, which is why they look cheaper and why they move more during construction.

Our view at RED, having delivered offices for Shinhan Bank, Samsung Engineering, SK E&S and Amorepacific Vietnam alongside projects for domestic companies, is that most businesses sit between the two models rather than squarely in either. The useful exercise is deciding which of the six items above your organization genuinely needs, rather than accepting or rejecting an entire standard.

Three Worked Budget Examples

Abstract rates are hard to plan with, so here are three complete scenarios. Each shows the full project cost rather than a single rate, which is how your finance team will want to see it.

Example 1: A 150 m2 Startup Office

Brief: 20 staff, open plan, one meeting room, a small pantry, basic reception. Leased space with a basic finished handover.

  • Design fee at 300,000 VND per m2: approximately 45,000,000 VND
  • Fit-out at 4,500,000 VND per m2 (basic tier): approximately 675,000,000 VND
  • Contingency at 7 percent: approximately 50,000,000 VND
  • Indicative total: around 770,000,000 VND, or roughly 5,130,000 VND per m2 all in

At this scale, the design fee is a small fraction of the total, which is exactly why cutting it is poor economics. A weak space plan in a 150 square meter office wastes floor area you are paying rent on every month for the length of the lease.

Example 2: A 600 m2 Company Headquarters

Brief: 70 staff, mixed open plan and enclosed offices, three meeting rooms, a boardroom, a proper reception, a staff pantry and a breakout area.

  • Design fee at 350,000 VND per m2: approximately 210,000,000 VND
  • Fit-out at 7,000,000 VND per m2 (mid-range tier): approximately 4,200,000,000 VND
  • AV and IT beyond basic cabling: approximately 300,000,000 VND
  • Contingency at 8 percent: approximately 375,000,000 VND
  • Indicative total: around 5,085,000,000 VND, or roughly 8,475,000 VND per m2 all in

This is the size where the enclosed-to-open ratio starts driving the budget hard. Every additional enclosed room adds partitions, a door, a dedicated air conditioning zone, separate lighting control and often acoustic treatment. Two extra meeting rooms can move a 600 square meter budget by several hundred million dong.

Example 3: A 1,500 m2 Multinational Regional Office

Brief: 180 staff, international workplace standard, video conferencing throughout, sit-stand desks, a server room, acoustic separation, brand integration, sustainability targets.

  • Design fee at 700,000 VND per m2: approximately 1,050,000,000 VND
  • Fit-out and furniture at approximately 17,000,000 VND per m2: approximately 25,500,000,000 VND
  • Project management and quantity surveying: approximately 1,000,000,000 VND
  • Contingency at 10 percent: approximately 2,750,000,000 VND
  • Indicative total: around 30,300,000,000 VND, or roughly 20,200,000 VND per m2 all in

At this level the professional fees and contingency that local quotes omit become unavoidable, because the cost of an uncontrolled variation on a project this size dwarfs the fee that would have prevented it.

Where the Money Actually Goes

Understanding the components matters more than memorizing a rate, because it tells you which conversations will actually move your budget. A typical office fit-out splits across five groups.

Builder Works

Demolition, partitions, ceilings, flooring, painting, doors and glazing. This is the visible shell of the office and usually the largest single group in a domestic fit-out. The cost driver here is not finish quality so much as the number of enclosed rooms, because every wall is material, labor, a door, and knock-on work in the ceiling and floor.

Mechanical and Electrical

Power distribution, lighting, air conditioning modifications, fire detection and sprinkler adjustments, data cabling containment. This is the group owners consistently underestimate because none of it is visible when finished.

Watch for two specific items. Relocating air conditioning indoor units requires refrigerant piping and condensate drainage with a continuous fall, which is often harder than it sounds. And any change to your room layout changes the sprinkler and smoke detector pattern, which must remain compliant and is inspected.

Furniture

Workstations, task chairs, meeting tables, soft seating, storage. In a basic domestic fit-out this might be a modest share. In an international corporate fit-out it is frequently the largest component of all. The difference between a locally made task chair and a specified ergonomic chair from a global brand can be five to ten times per seat, multiplied by every employee.

This is the line where a clear decision early saves the most money. Decide your furniture standard before design development, not after, because the space plan depends on the footprint of what you choose.

Audio Visual and IT

Displays, video conferencing, room booking systems, structured cabling, access control, the server room. Costs scale with the number of meeting rooms rather than with floor area, so a small office with four meeting rooms can carry a higher AV cost per square meter than a large one with two.

Joinery and Feature Areas

Reception desk, pantry, feature walls, bespoke storage, the boardroom. These are concentrated spends in a small percentage of the floor area, and they carry most of the visitor impression. A sensible strategy for a constrained budget is to hold standard specification across the working floor and concentrate quality into reception and the boardroom, which are the two rooms clients actually see.

The Factors That Move Your Office Interior Design Cost Most

Two offices of identical size can differ by a factor of three. These are the variables responsible, roughly in order of impact.

  • The ratio of enclosed rooms to open plan. The single biggest structural driver. More walls means more of everything behind them.
  • Furniture specification. Discussed above, and worth repeating because it moves budgets more than any finish decision.
  • New fit-out versus refurbishment. Cushman & Wakefield’s figures put a Ho Chi Minh City upgrade at roughly half the cost of a new fit-out, which makes reusing sound existing elements genuinely material.
  • Base building condition. A Grade A tower with adequate power, modern air conditioning and a raised floor costs far less to fit out than an older building needing upgrades before your work even begins.
  • Handover condition of the leased space. Bare shell, warm shell and previously fitted all imply very different scopes, and previously fitted can be the most expensive once demolition and disposal are counted.
  • Acoustic requirements. Full-height insulated partitions and acoustic ceilings cost substantially more than a standard partition to a suspended ceiling.
  • Green building certification. LEED, WELL or similar targets add specification requirements, documentation and consultant fees.
  • Program length. Compressed schedules mean overtime, weekend rates and parallel trades, and buildings that restrict working hours force more of the work into premium time.
  • Floor plate efficiency. An awkward plate with many columns and deep corners yields less usable area per square meter paid for, which raises your effective cost per seat.
  • Imported versus local materials. Import duty, VAT, shipping and lead times apply, and a long lead item that misses its slot costs schedule as well as money.

Costs That Rarely Appear in the First Quote

These are the items that turn an agreed figure into a larger final invoice. Ask about each one explicitly before you sign.

  • Building management deposits and fees. Most office towers hold a refundable fit-out deposit and charge for after-hours access, lift usage and debris removal.
  • Landlord approval and consultant review. Many landlords require your drawings to be reviewed by their own consultants, at your cost, before work is permitted.
  • Make-good obligations. Your lease almost certainly requires you to restore the premises at the end of the term. That is a future cost created by today’s design, and a heavily built-out office is expensive to strip.
  • Base building upgrades. If your occupancy exceeds the building’s design provision for power or air conditioning, the upgrade is yours to fund.
  • Fire safety re-certification. Changing the room layout changes the fire strategy, and inspection and certification take time as well as money.
  • IT migration and cutover. Moving servers and network equipment usually happens outside working hours and is frequently quoted separately or not at all.
  • Signage and wayfinding. Exterior signage often needs landlord and sometimes municipal approval.
  • Moving and temporary storage. Rarely in a fit-out quote, always in the real budget.
  • Dual rent. The overlap period where you pay for the old office and the new one. For a three-month fit-out this can be a substantial line.
  • Post-occupancy adjustments. Every office needs small fixes in the first months. Budget one to two percent rather than treating each one as a dispute.

How to Read and Compare Office Fit-Out Quotes

Once you have three proposals on the desk, the comparison itself is a skill. Work through these in order.

Step 1: Normalize the Scope Before You Look at the Price

Start here, because comparing totals built on different scopes produces a confidently wrong answer. List every element: demolition, partitions, ceilings, flooring, electrical, air conditioning, lighting, furniture, AV, joinery, signage. Mark which quotes include each. You will usually find the cheapest quote is cheapest because it excludes two or three items the others carry.

Step 2: Count the Provisional Sums and Allowances

Now that scope is aligned, look for placeholder figures. An allowance is not a price; it is a number that will be replaced by the real cost later and billed to you. A quote with eight allowances is substantially less committed than a quote with one, even if the totals match.

Step 3: Check the Specification Behind Each Rate

With allowances identified, examine what the committed items actually buy. Board type and thickness, hinge and runner brands, paint system, ceiling tile specification, partition construction, glass thickness, carpet weight. Two quotes at the same rate per square meter can differ enormously here, and this is where the cheaper one usually got cheaper.

Step 4: Confirm Who Carries Which Risk

Having compared content, compare responsibility. Who obtains landlord approval? Who pays if the building rejects the drawings? Who covers after-hours access charges? Who is liable for damage to common areas? Each of these is a real cost that lands on someone.

Step 5: Read the Variation Clause Before the Total

Finally, read how changes are priced, because every office project has them. The clause should state how a variation is valued, who approves it, and whether it affects the program. A contract with a vague variation clause is a contract whose final price is unknown, whatever the headline figure says.

For a fuller view of how the stages connect before construction begins, our breakdown of the office interior design process walks through each phase from brief to handover.

Where to Save and Where Not To

Every project has a budget conversation. These are the trades that work and the ones that cost more later.

Sensible Places to Save

  • Reduce enclosed rooms. The highest-value saving available, and often improves the workplace rather than compromising it.
  • Keep sound existing elements. A serviceable ceiling grid, functioning air conditioning or a reusable raised floor can save a great deal, which is why refurbishment benchmarks at roughly half the cost of a new fit-out.
  • Standardize workstations. One desk type across the floor buys better pricing and simplifies future churn.
  • Use local manufacturing for joinery. Vietnam’s millwork capability is genuinely strong, and locally built joinery to a good specification outperforms imported mid-range furniture at the same price.
  • Concentrate quality where it is seen. Reception and the boardroom carry the brand impression. The storeroom does not.

Places Saving Costs More Later

  • The design fee. It is a small share of the total and it determines how controlled everything else is. Incomplete drawings are paid for in site variations, at a worse rate.
  • Task seating. Your staff sit in these chairs eight hours a day for years. It is the clearest ergonomic and retention cost in the project.
  • Electrical capacity and data cabling. Both are buried behind finishes. Adding capacity later means opening what you just built.
  • Acoustic treatment. The most common post-occupancy complaint in open-plan offices, and almost impossible to retrofit without disruption.
  • Lighting quality. Cheap fittings with poor color rendering and visible glare make an otherwise good office unpleasant to work in, and replacing them means touching the ceiling again.
  • Contingency. Deleting the contingency line does not remove the risk, it just removes your plan for it.

Payment Schedules and Contract Terms

How you pay matters almost as much as what you pay. A sound schedule ties money to delivered milestones rather than to the calendar.

  • Design fee: commonly split across concept approval, design development and issue of construction documentation. Avoid paying the full design fee before you have seen the technical drawings.
  • Fit-out: typically an initial payment on mobilization, then progress payments tied to verifiable stages such as completion of partitions, completion of ceilings and services, and joinery installation.
  • Retention: hold back five to ten percent for a defects liability period of at least six months. This is the only real leverage you have after handover.
  • Furniture: usually requires a deposit at order because items are manufactured to order, with the balance on delivery and acceptance.

Be cautious of any schedule front-loading a large payment with no defined deliverable attached. Confirm in writing what happens if the landlord rejects the drawings or the program slips through no fault of yours.

RED Interior Design & Architecture — Your Partner For Office Design in Vietnam

Backed by over 30 years of industry experience and Korean design precision, RED Interior Design & Architecture delivers turnkey office environments tailored to your capital expenditure goals.

RED is a trusted design and build partner for leading international corporations across Vietnam, including Shinhan Bank, Samsung Engineering, SK E&S, Amorepacific, and Shin & Kim Law Firm.

Our team helps you optimize every dollar, delivering sophisticated, high-performance workspaces on time and within budget.

Design Your Office Interior With Confidence

The honest summary of this market is that Vietnam offers unusually good value and unusually wide variance. A basic 150 square meter office can be delivered for under 800 million VND all in. A 1,500 square meter international regional headquarters can pass 30 billion. Both are reasonable prices for what they are, and the only way to know which end of that range your project sits at is to define the specification before you ask for a number.

Our view, after nearly two decades of delivering offices in this city, is that cost overruns almost never come from the rate per square meter. They come from scope that was never defined, allowances that were never priced, and drawings that were never finished before work started. Those three things are controllable, and they are controlled during design, which is the cheapest phase of the project.

Decide three things before you approach any firm: your enclosed-to-open ratio, your furniture standard, and whether you are buying a domestic fit-out or an international one. With those settled, every quote you receive becomes comparable, and the conversation moves from price to value.

If you want a costed proposal for your space, explore the full range of services on the RED Interior Design and Architecture site, or contact our team to discuss your requirements. We will give you an itemized breakdown rather than a single rate, and tell you honestly where your brief and your budget do not yet match.

Frequently Asked Questions

1. How much does office interior design cost per square meter in Vietnam?

Design fees typically run 150,000 to 1,200,000 VND per square meter depending on the firm’s tier, and fit-out construction typically runs 4,000,000 to over 10,000,000 VND per square meter. For international-standard corporate fit-outs, Cushman & Wakefield benchmarks Ho Chi Minh City at around USD 656 per square meter for a new fit-out and around USD 344 for an upgrade.

2. Is the design fee included in the fit-out price?

Sometimes, and that is the problem. Many design-and-build firms advertise free design when you award them the construction contract. The fee has not disappeared, it has moved inside the build price where you cannot audit it. Ask for the design fee to be shown as a separate line even when it is bundled, so you can see what you are paying for documentation.

3. Why is renovating an existing office cheaper than a new fit-out?

Because the expensive invisible work is already there. Ceiling grids, air conditioning distribution, electrical risers, sprinkler layouts and sometimes flooring can be retained if they are sound. Cushman & Wakefield’s Ho Chi Minh City figures put an upgrade at roughly half the cost of a new fit-out, which is why a proper condition survey before you commit to a strategy pays for itself many times over.

4. How long does an office fit-out take in Ho Chi Minh City?

Design usually runs four to eight weeks depending on size and how many concept rounds you need. Landlord and building approval adds one to three weeks. Construction typically runs six to sixteen weeks by scale and complexity. Long lead furniture and AV equipment can extend the handover date if ordered late, so place those orders during construction rather than after it.

5. What percentage of my budget should the design fee be?

On most projects it lands somewhere between three and eight percent of total project cost, trending toward the lower end as floor area grows. Treating it as a line to minimize is usually false economy, since the documentation it produces is what keeps the other ninety-plus percent under control.

6. Should I use one company for both design and construction?

For most offices under roughly 2,000 square meters, yes. Office fit-outs are short, dense programs where coordination failures do disproportionate damage, and a single accountable party removes the gap between designer and contractor. Separating the two makes more sense on large or multi-phase projects where you have your own project manager to hold both sides to account.